News - January 2024
Photovoltaic panels: decarbonisation and energy cost control
3350 photovoltaic panels on JOUBERT Plywood sites!
The JOUBERT Group is pursuing its energy transition by investing in a 7060 m2 photovoltaic park across its two industrial sites.
Started at the end of 2022 and completed in October 2023, this installation enables JOUBERT Plywood to self-generate 20% of the electricity it consumes.
A second section is being installed in 2024, which will take this figure up to 35 to 40%.